SPORT HOTEL, BRASOV

Description:

With respect to this objective, both a project for the retrofitting of the accommodation area of the existing building – the restoration of the attic and the transformation thereof into a garret being aimed at – and a project for a new multifunctional building consisting of basement + ground floor + 1 floor (S+P+1E) were carried out. In addition, a technical survey was also conducted in relation to the post-fire assessment and to the possibilities of
restoring the structure to its condition prior to the fire burst (an overall survey was conducted as well on the structure).

Gallery: